The Student Dormitory
Estimated Completion Date: TBD 2023
Constructed in the late 60’s, disrepair left this building nearly condemned.
When fully restored will contain 16 showers, 18 toilets, and bunks for up to 200 people; nearly 16,000 sq. ft. of space for children and adults when they arrive in Patrick Springs!
With plumbing for 4 bathrooms that include 18 toilets, sinks along with 4 shower rooms outfitted with 12 showers, Camp will be equipped for almost any ministry scenario!
An incredible amount of work has already been completed, but there's a long way to go before we are able to serve children again!
When our demolition crews began to peel back the layers, we quickly realized how big of a project this one was going to be. Stripped all the way to the bones, the Patrick County Building Inspectors assured us that we were doing the right thing by restoring over rebuilding!
Amount remaining to structural completion: appx: $70,000.00
Estimated furnishing costs (including Bunk Beds): $95,000.00
ELECTRICAL MATERIALS NEEDED:
Estimated cost - $9,073.03
TRIM MATERIALS NEEDED:
Estimated cost - $8,145.15
HVAC MATERIALS NEEDED:
Estimated cost - $52,806.00
MISC MATERIALS NEEDED:
Estimated cost - $100,958.88
ALL PLUMBING MATERIALS (Est. $10,962.96) HAVE BEEN RECEIVED!! STORY COMING SOON!
Completed Tasks so far:
Custom Pan-Concrete Floor System
Plumbing Sub-System
Electrical Sub-System
Drywall and Windows
Custom Lower-Level Fire -Suppression Door/Entryways
New Roof and Gutters
New Decking
Tasks to completion:
Upstairs Door/Entryways
Plumbing Furnishing/Finishing
Electrical Furnishing/Finishing
Downstairs Concrete Floor Finishing
Upstairs Floor Coverings
HVAC and Dorm Room Furnishing
Landscaping
Room furnishings - both levels